Task Connectors can be solid instead of dotted across swimlanes

Howdy Forum,

I am trying to change the task connectors from dotted to solid across different swimlanes.
Please guide me if anyone able to do it.

Thanks

The only way to do this is splitting the pools (what you currently have) into multiple lanes. To do so, click on the pool label (e.g. “Swimmlane 1”), then use either one of the Add or Split functions.

In BPMN, each pool contains a separate independent process and there is no flow between processes. Only messages may be exchanged (shown by dashed connectors).

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.