How modes misc set of parallel tasks

I have a network configuration project where we need to configure a set of network nodes. A set would consist of two to 10 individual nodes. The kinds of nodes configured would vary greatly from configuration order to configuration order. All of the nodes except the first can be configured in parallel. The entire configuration is finished when all the nodes are configured. The workflow for each node looks approximately like this:

19%20PM

Can anyone suggest what the top level workflow would look like for the set of configurations?

I hope my topic is appropriate for this forum.

Thanks!

I have a network configuration project where we need to configure a set of network nodes. A set* would consist of two to 10 individual nodes. Parallel execution divides the ask of executing a SQL statement into … No more than twoc 192.168.l.254 sets of parallel execution servers can run simultaneously. In data parallel model, tasks are assigned to processes and each task performs similar types of operations on different data. Data parallelism is a consequence …